For Lobsterfish, we constructed a new cold storage facility complete with a loading zone and 9 bays, while also retrofitting the existing building with 5 additional loading docks and doors. Preparatory groundworks began in mid-October, and by the Christmas break, the new building was already ready to cool down to -12 degrees. A project of this nature was a first for us, and we are particularly proud of meeting such a tight deadline.